Демонтаж бетона: rezkabetona.su

Главная  Переработка нефти и газа 

Скачать эту книгу

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 [ 81 ] 82 83 84

----- Makowski, М. М., Mochlinski, К- (1956): An evaluation of two rapid methods of

assessing the thermal resistivity of soil. Proceedings of the Institution of Electrical Engineers, Oct.

Maksutov, R. A., Gazimov, M. G. (1971): Vliyanie elektricheskikh svoistv materia-lov na otiozhenie parafina. Neftyanoe Khozyaistvo 7.

Mamedov, Z. I.. Mustafaev, S. D., Bairamov, A. A. (1971): Prinuditelnoe izmene-

nie vremeni opredeleniya plastovogo davleniya glubinonasosnykh skvazhin. Neft i Gaz 6.

Mapes, G. J. (1960): The low temperature separation unit. World Oil, Jan. Martch, H. В., McCall, N. J. (1972): Optimization of the design and operation of natural gas pipeline systems. SPE Preprint 4006.

.Martin, J. S. (1961): Stop pounding that pumping well. Petroleum Engineer,

May.

Martin, J. T. (1970): Low level automation for marginal leases. Petroleum Engineer, May.

Mayer-Gurr, A. (1971): Erdgas - Produzenten und Erdgas - Abnehmer. Gasver-w-endung 10.

McAfee, R. V. (1961): The evaluation of vertical-lift performance in producing wells. Journal of Petroleum Technology 4.

McCurdy, R. C., Elkins, L. E. (1967): Impact of New Technology on the US Petroleum Industry 1946-1965. National Petroleum Council, Washington.

McDannold, G. R. (1960): How to determine pumping loads with hollow sucker rods. Oil and Gas Journal, Aug. 1st.

McDonald, E., Baker, O. (1964): Spheres up capacity 30-707o. Oil and Gas Journal, June 15th, 22nd, 29th,

McGhee, E. (1957): How to get cheap daily tests on every well. Oil and Gas Journal, April 8th.

McLeod, W. R., Anderson, D. L., Day, J. J. (1972): A comparison of vertical two-phase computation techniques. ASME Preprint 72-Pet-38.

Metcalf, J. P., Landry, R. W. (1971): Turbine meters offer benefits for the big oil producers. Oil and Gas International 4.

Mettersi, E. W. (1970): A new concept in pumping unit technology. SPE Preprint 3193.

Metzner, A. В., Reed, J. C. (1955): Flow of non-Newtonian fluids - correlation of the laminar, transition, and turbulent flow regions. A. I. Ch. E. Journal 12.

Michie, T. W., Page, W. A., Kidd, A. N. (1970): Program for maintaining equipment reliability and data integrity in a large-scale computer production control project. SPE Preprint 2935.

Mikhalkov, P. V., Vosrikova, V. P., et al. (1967): Termoobrabotka nefty как odin

iz faktorov uvelicheniya proizvoditelnosty nefteprovodov. Neftyanoe Khozyaistvo 1.

----- Milinsky, V. M., Kharlamenko, V. I., LutfuUin, A. Kb., Buskunov, A. A. (1970):

Puti snizheniya energeticheskikh zatrat glubinnonasosnykh ustanovok. Neftyanoe Khozyaistvo 8.

Milley, Gy. (1970): Nevezektani problemak a koolajok magas homersekleten der-mcdo termeszetes komponenseivel kapcsolatban. kiilonos tekintettel a reologiai tulajdon-sagokat befolyasolo komponensekre (Problems of terminology concerning the high-pour-point natural components of crudes, with special regard to those components affecting rhcological behaviour). Research Report, Petroleum Engineering Department, University of Heavy Industries, Miskolc, Hungary.



Milton, L. H. (1972): PCP. Humble computerized data system for manually operated oil field. Oil and Gas Journal, March 13th.

Mirzadzhanzade, A. H., Mingaraev, R. Sh., Zaitsev, Yu. V., Gurbanov, R. S., Rasi-zade, Ya. M. (1969): A nem newtoni folyadekok aramlasa csovekbcn. Nehany hidrodi-naniikai hocsercfeladat (Flow of non-Newtonian fluids in pipes. Some problems of heat exchange in hydrodynamics). Koolaj es Fdldgaz 3.

Mitlendorf, M., Schlemm, F. (1971): Prozessrechnercinsatz zur Leitungsiiberwa-chung in Ferngasnctzen. Erdoel - Erdgas - Zeitschrift 11.

Mokhanov, V. I. (1962): Izmerenic razkhoda i kolichestva zhidkosty, gaza i para. Goscnergoizdat, Moscow.

Monye, G. (1959): Rcgelung des Tiefpumpenaniriebes durch den Olzufliiss. Erdol und Kohle I.

--- Muradov, A., Mametklychev K- H. (1970): Opredelenie optimalnoi temperatury podogreva parafinovykh neftei pered perekachkoi. Transport i Khraneniye Nefty i Nefteproduktov 6.

~ Muraviev, I. M. (1959): Spravochnik po dobyche nefty. (Vol. II.) Gostoptekhizdat, Moscow.

- . Muraviev, I. M., Knisenko, G. N., Mishchenko, 1. Т., Knyazev, N. S.. Olifer, S. L. (1971): Vliyanie reologicheskikh svoistv nefti na rabotu pogruzhnogo tsentrobezhnogo nasosa. Neftepromyslovoe Delo 2.

~ Muraviev, I. M., Krylov, A. P. (1949): Ekspuatatsiya neftyanykh mestorozhdeniy. Gostoptekhizdat, Moscow.

Natural Gasoline Association of America (1957): Equilibrium Ratio Data Book. Tulsa.

Nematizadeh, F. (1969): Silicone injection boosts separator capacity 40%. World Oil, May.

Nemudrov, A. G., Kulikov, V. A. (1971): Optimalnoe rezhimy rabotu nasosnykh stantsii «goryachego» nefteprovoda. Neftyanoe Khozyaistvo 6.

Nichols, R. (1968): Dewatering gas wells. API Preprint 851-42-A.

Nind, T. E. W. (1964): Principles of Oil Well Production. McGraw-Hill Book Co., New York, Toronto, London.

---Nomisikov, Yu. P., Khalichin, A. G., Samilev, M. A. (1970): Oborudovanie skvazhiny

rekomenduemoe dlya mestorozhdenii soderzhashchikh serovodorodov. Gazovaya Promyshlennost 10.

November, M. H. (1972): Electronic density-measuring system is accurate, versatile. Oil and Gas Journal, Febr. 21st.

------Novoselov, V. F., Kandurov, A. A. (1971): Uchet inertsii pri raslichetc neustano-

vivshegosya dvizheniya zhidkosti v truboprovode. Neftyanoe Khozyaistvo 9.

Oates,,J. A. (1962): Pipes and Pipelines Manual and Directory. (1st ed.) Scientific Surveys Ltd., London.

OBrien, H. L. (1951): Petroleum Tankage and Transmission. Graver Tank and Mfg. Co. Inc., Houston, Texas.

ODonnell, U. P. (1968): Gettys new heated crude line is probably worlds largest. Oil and Gas Journal, April 8th.

ODonnell, J. P. (1969): TGT makes valuable use of densitometers. Oil and Gas Journal, Nov. lOth.

Oil and Gas Journal (1956): Automatic custody transfer. - June 11th.

Oil and Gas Journal (1963): Treating plant will make high-wax crude transportable by pipeline. - Febr. 25tli.



Oil and Gas Journal (1964): S 500.000 automation investment.- July 27fn. Oil and Gas Journal (1969): Chemicals solve tank shortage. - Jan. 27th. Oil Well Supply (1957): Selection and application of subsurface pumps. Bulletin 6-956.

Omana, R., Houssiere, Jr., C, Brown, K. Ё., Brill, J. P., Thompson, R. E. (1969): Multiphase flow through chokes. SPE Preprint 2682.

ONeil, R. K. (1972): Operating costs and performance of large-volume submergible pumps. Journal of Petroleum Technology 12.

Orkiszewski, J. (1967): Predicting two-phase pressure drops in vertical pipe. Journal of Petroleum Technology 6.

Orlicek, A. P., Poll, H. (1951, 1955): Hilfsbuch fur Mineraloltechniker (I-11). Springer Verlag, Wien/New York.

Palm, C. D. (1962): NGPL insured with automatic valve. Pipeline Engineer 6.

Panteleev, G .V. (1970): Turbulizator potoka primenyaemy dlya uvelicheniya davleniya na uste skvazhin. Neftepromyshlovoe Delo 9.

Papay, J. (1970): Termelokutak es vezetekek homerseklet viszonyai stacioner aUa-potban (Steady temperature distributions in producing wells and pipelines.) Koolaj es Foldgaz 11.

Papay, J. (1971): Gaztelep, -kut es-vezetek teljesitmenyegyenlete (Performance equations of oil reservoir, well, and flowline). Koolaj es Foldgaz 8.

Pasqualini, M. (1950): Le rechauffage des produits petroliers lors de leur transport dans les pipe-lines. Bulletin de IAssociation Francaise des Techniciens du Petrole 8.

Patsch, F. (1971): Fuggoleges ketfazisu aramlas nyomasviszonyainak szamitasa (Calculation of pressure traverse,, in vertical two-phase flow). Banyaszati es Kohaszati Lapok, Koolaj es Foldgaz 12.

Patton, L. D. (1970): Continuous rod design. Petroleum Engineer, Aug.

Pearson, W. G. (1969): Is there a computer in your oil fields future? Oil and Gas Journal, May 26th.

Pektyemirov, G.A. (1951): Asvanyolajtelepi kezikonyv (Petroleum tankage handbook). NIK, Budapest. (Translation from Russian.)

Perkins, T. K., Turner, J. B. (1971): Starting behaviour of the gathering lines and pipelines when filled with gelled Prudhoe Bay oil. Journal of Petroleum Technology 3.

Perry, C. W. (1964): The modern ball valve. Petroleum Times, May 15th.

Perry, J. H. (1969):-Vegyeszmernokok kezikonyve (Chemical engineers handbook). iWiiszaki Konyvkaido, Budapest. (Translation from English.)

Petroleum Engineer (1958"): Sonic pump bows in. Sept.

Petroleum Extension Service (1955): Oil Pipe Line Measurement and Storage Practices. The University of Texas, Texas.

Petroleum Extension Service (1956): Field Handling of Natural Gas.-The University of Texas, Dallas.

Phoenix-Rheinrohr AG (1960): Tabellen fur Tiefbohrtechnik. Dusseldorf.

Pipeline News (1960): Annual automation symposium. - 10. Bayonne, N. J.

Pipeline News (1972): Shell moves viscous oil through unhealed lines.- 5. Bayonne, N. J.

Pisarik, M. N. (1972): Raspredelenie temperatur po stvolu skvazhiny pri rabote nagrevatelei. Neftepromyslovoe Delo 9.

PLI Staff (1970): New triple action syphon pig leaves pipe lines clean and dry. Pipe Line Industry 1.

Poettmann, F. H., Beck, R. L. (1963): New charts developed to predict gas-liquid flow through chokes. World Oil, March.




0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 [ 81 ] 82 83 84



Яндекс.Метрика