Демонтаж бетона: rezkabetona.su

Главная  Переработка нефти и газа 

Скачать эту книгу

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 [ 82 ] 83 84

Poettmann, F. H., Carpenter, P. G. (1953): The multiphase flow of gas, oil and water through vertical flow strings. API Drilling and Production Practice, 1952. Dallas.

Powers, M. L. (1972): Optimizing sucl<er rod replacement. Oil and Gas Journal. Febr. 7th.

Price, R. C. (1971): Flow impovers for waxy crudes. Journal of the Institute of Petroleum 3.

Pruitt, G. Т., Simmons, C. M., Neil, G. H., Crawford, M. R. (1965): A method to minimize the cost of pumping fluids containing friction-reducing additives. Journal of Petroleum Technology 5.

Prutzman, F. G. (1955): Problems and economics of dual completions. Petroleum Engineer, July.

Puscoiu, N. (1970): Debitmetri de masa folosite la masurarea productiei de titei ji gaze. Petrol ji Gaze 4.

Pylant, H. S. (1961): Plastic pipe in oil and gas fields. Oil and Gas Journal, Febr. 27th.

Raabe, J. (1970): Rumpen. Hydraulische Maschinen und Anlagen (Teil 3). VDI- Verlag GmbH, Diisseldorf.

Rabinovitch, E. Z., Kuznetsov, P. B. (1970): Gidravlichcskie soprotivleniya magis-tralnykh nefteprovodov. Transport i Khranenie Nefti i Nefteproduktov 7.

Rachford, H. H. (1972): Transient-pipeline calculations improve desing. Oil and Gas Journal, Oct. 30th.

Raulins, G. M. (1972): Safety by down-hole well control. Journal of Petroleum Technology 3.

Reher, E. 0., Mylius, E. (1967): Eine Obersicht fiber einige Methoden zur Berechnung des Druckverlustes beim Transport zeitunabhangiger nicht - Newtonscher Fliis-sigkeiten in Rohrleitungen. Chem. Techn. 3.

Reid, A. M. (1969): Valve desing and selection. Pipes and Pipelines International 4.

Reneau, G. (1953): Design and development of improved annular survey equipment and techniques. API Drilling and Production Practice. 1952. Dallas.

Reppisch, I. (1958): Mengenmessung mit Ovalrad-Fliissigkeitzahlern in der Erdol-industrie. Erdoel Zeitschrift 8.

Resen, L. (1957): Humble tries L. A. C. Т., gives it stamp of approval. Oil and Gas Journal, March 4th.

Ritter, R. A., Baticky, J. P. (1967): Numerical prediction of the flow characteristics of thixotropic liquids. Society of Petroleum Engineers Journal, Dec.

Ritter, R. A., Govier, G. W. (1970): The development and evaluation of theory of thixotropic behaviour. Canadian Journal of Chemical Engineering 348.

Roberts, B. J. (1970): Panhandle extends its automation. Oil and Gas Journal July 23rd.

Ros, N. C. J. (1961): Simultaneous flow of gas and liquid as encountered in we.-tubing. Journal of Petroleum Technology 10.

Rose, S. C, Marsden, S. S. (1970): The flow of North Slope crude oil and its emul-, sions at low temperatures. SPE Preprint 2996.

Sanders, J. M. (J969): Basic criteria for the sizing and selection of control valves. Pipes and Pipelines International 10, 12.

Saye, H. A. (1958): Automatic well testing. Oil and Gas Journal. Jan. 6th.

Schlichting, P. (1970): Der Transport von 01 - Wasser - Gas Gemischen in Er-dolfernleitungen. Erdoel - Erdgas - Zeitschrift 6.



Schmoc, W. P. (1959): Bottom hole separators increase production. World Oil,

April.

Scott, R. W, (1965): Vacuum stabilizers boosts income minimize production problems. World Oil, Jan.

Scott, J. (1967): Production automation breaks barriers. Petroleum Engineer,

June.

Scott, J. (1969): The revolution in artificial lift. Petroleum Engineer, Febr.

Scott, J. (1971): CPC new way of oil country life. Petroleum Engineer, Aug.

Scott, J., Crosby, G. (1970): What does industry expect of computer production control. Petroleum Engineer, May.

Sens, M. (1969): Evolution of gas measurement in France. Pipe Line Industry 2.

Shaver, R. G., Merrill. E. W. (1959): Turbulent flow of pseudoplastic polymer solutions in straight cylindrical tubes. A. I. Ch. E. Journal 6.

Shamir, U. (1971): Optimal route for pipelines in two-phase flow. Society of Petroleum Engineers Journal, March.

Shaw, S. F. (1939): Gas-lift Principles and Practices. Gulf P. C, Houston, Texas.

Shephard, P. A., Williams, R. W. (1965): The application of analogue computer techniques to the distribution system of the North Thames Gas Board. The Institution of Gas Engineers, Communication 700 (London), 11.

Sherman, P. (1963): Changes in the rheological properties of emulsions on aging, and their dependence on the kinetics of globule coagulations. I. Phys. Chem. 12.

Shirkovsky, A. I. (1970): Estimating minimum flow rate required for continuous removal of condensate from gas wells. SPE Preprint 2937.

Shishchenko, R. Y., Apriesov, K. A. (1952): A koolaj szallitasa es tarolasa (Transport and storage of petroleum). NIK, Budapest. (Translation from Russian.)

Simmons, W. E. (1972): Optimizing continuous flow gas lift wells. (Parts I-II.) Petroleum Engineer, Aug., Sept.

Slonegger, J. C. (1961): Dynagraph Analysis of Sucker Rod Pumping. Gulf P. C, Houston, Texas.

Smirnov, A. S., Shirkovskyi, A. I. (1957): Dobycha i transport gaza. Gostoptekhizdat, Moscow.

Smith, R. S. (1968): Submergible pump completion in tow-phase flowing wells. Petroleum Engineer, Dec.

Snyder, R. E. (1970): New pumping methods boost oil production. World Oil,

May.

Societe du Journal des Usines a Gaz (1968): Manuel pour le transport et la distribution du gaz. Paris.

Sommer, H. A. (1972): An approach to oil field automation. SPE Preprint 3971. Speel, L. (1967): High pressure gas well completions. Seventh WPC Proceedings 3.

Spink, L. K. (1958): Principles and Practice of Flow Meter Engineering. The Fox-boro Co., Massachusetts.

Standing, M. B. (1952): Volumetric and Phase Behaviour of Oil Field Hydrocarbon Systems. Reinhold P. C, New York.

Standing, M. В., Katz, D. L. (1942): Density of crude oil saturated with natural gases. Trans. AIME 146.

Stearns, R. F., Johnson, R. R., Jackson, R. M., Larson, C. A. (1951): Flow Measurement With Orifice Meters. D. Van Nostrand Co. Inc., Toronto, New York, London.

Stephens. M. M., Spencer, O. F. (1950): Natural Gas Engineering. The Pennsylvania State College. Pennsylvania.



Stewart, Т. L. (1971a): Computer speeds surge calculations. Oil and Gas Journal, Nov. 22nd.

Stewart, T. L. (1971b): Modelling liquid pipelines in transient and steady state. Pipeline News 12.

Stoner, M. A. (1970): A new way to design natural gas systems. Pipe Line Industry 2.

Stoner, M. A. (1971, 1972): Sensitivity analysis applied to a steady-state model of natural gas transportation systems. SPE Preprint 3056; and Society of Petroleum Engineers Journal, April.

Stradtmann, F. H. (1961): Stahlrohr Handbuch. (6. Aufl.) Vulkan-Verlag, Essen.

Streeter, V. L., Wylici E. E. (1970): Natural gas pipeline transients. Society fo Petroleum Engineers Journal, Dec.

Swinney, G. W. (1972): Gas measurement with on-line computers. Pipe Line Industry 7.

Szendy, K. (1967): Korszerti halozatszamitasi modszerek (Modern network analysis methods). Akademiai Kiado, Budapest.

Szilas, A. P. (1955): Betriebsverhalthisse gasfreies 01 fordernder Sonden. Mittei-lungen der Fakultaten, fiir Bergingenieure und Geo-Ingenieure (XVIII). Techn. Univer-sitatsfakultaten, Sopron.

Szilas, A. P. (1957): A gazdasagos termeloberendezes kivalasztasa (Choosing the most economical production equipment). Banyaszati Lapok 6.

Szilas, A. P. (1959): Bestimmung des Druckkoeffizienten aus den Betriebsdaten der Oisonde. Mitteilungen der Fakultaten fiir Bergingenieure und Geo-Ingenieure (XX). Techn. Universitatsfakutaten, Sopron.

Szilas, A. P. (1962): Intermittende Gaslift- und Plungerliftforderung - zwei ratio-nelle Forderverfahren fiir geringproduktive Sonden. Freiberger Forschungshefte A233.

Szilas, A. P. (1964): Kontinuierlicher oder intermittierender Betrieb von Pumpson-den? Erdoel -Zeitschrift 3.

Szilas, A. P. (1966): Erdolgewinnung. Fernstudium. Bergakademie, Freiberg.

Szilas, A. P. (1967): A foldgaz termelese, elokeszitese es szallitasa (Production, handling and transportation of natural gas). Miiszaki Konyvkiado, Budapest.

Szilas, A. P. (1968): Startdruckiinderung eines in einer Erdolfernleitung abkiihlen-den strukturviskosen Dies. Erdoel - Erdgas - Zeitschrift 9.

Szilas, A. P. (1971): Tixotrop pszeudoplasztikus koolaj nyomasvesztesegszamitasra alkalmas folyasi gorbeinek meghatarozasa (Determining the flow curves permitting head loss calculation for thixotropic-pseudoplastic crudes). Koolaj es Foldgaz 4.

Szilas, A. P., Falk, R. (1959): Koolaj - es foldgaztermeles (Oil and gas production). Mining Handbook. II. Miiszaki Konyvkiado, Budapest.

Taylor, C. J. (I960): How and why tubing anchors reduce operating costs of rods. Canadian Oil and Gas Journal 6.

Terris, J. (1965): How and when to automate oil producing facilities. World Oil,

June.

Thielen, H. (1971): Die Druckwellengeschwindigkeit in Pipelines unter dem Ein-fluss von Temperatur und Druck. Rohre - Rohrleitungsbau - Rohrleitungstransport, Oct.

Thomas. L. K-, Hankinson, R. W., Phillips, K. A. (1970): Determination of acoustic velocities for natural gas. Journal of Petroleum Technology 7.

Thomas, N. L. (1965): Polyurethane foam insulates Australian heavy oil line. Pipe Line Industry 5.




0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 [ 82 ] 83 84



Яндекс.Метрика